In support of a design-build contract headed by Magnus Pacific Construction and North Star Construction, CRETE will design drainage infrastructure for a naval station access road that has failed. The road traverses a mountain face near Arlington, Washington and provides access to a radio-communication station. A geotechnical investigation will be performed to support design of the roadway improvements. The surface water diversion system will be enhanced and a subsurface drainage system will improve stability of the roadway.