Soil excavation in preparation of the Targa Sound Terminal Renewable Fuels Expansion Project began on September 10, 2012. CRETE designed the soil excavation/stabilization, is managing construction, and is conducting confirmation sampling. A blend of magnesium oxides and calcium phosphates is mixed in-place into soil to prevent leaching of lead and cadmium, thus reducing transport and disposal costs.